Just a little update from yesterday; Graham cut a channel through the concrete hall floor to link the pipework (which route through the ducting and vents) to the hall radiator (on the other side of the hall).
He then concreted the pipework in, which I reckon is pretty brave prior to filling the system, but Graham's like that ;)
One pic:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment